How To Install Ice And Water Shield Video
Ice and water shield installation tricks duration.
How to install ice and water shield video. Get free tips like this by subscribing. Installing gaf ice water shield underlayments roof shingles duration. Gcp requires side laps to be a. The adhesive back surface of the membrane will bond to the roof deck which is.
Peel the release liner from the membrane. Cut the membrane into into 10 3 m to 15 4 5 m lengths. Unroll and align with the lower edge of the drip edge if used or the lower edge of the roof overhanging eaves by 1 4 6 35 mm to 3 4 19 mm tack top edge with four equally spaced temporary fasteners. Armourgard stormshield have a 2 piece release film split down the center of the roll along the long.
Peel back 300 600 mm 1 2 ft of release liner align membrane. Proper installation of grace ice water shield the conventional method. Cut the membrane into 3 5 m 10 15 ft lengths and re roll loosely. Grace ice water shield installation application duration.
Minimum overlap guidelines are set by the manufacturer. Gcp applied technologies 86 346 views. Press the membrane in place with heavy hand pressure. The best ice and water shield products come with a sbs co polymer in them that makes them very sticky so they bond permanently to the wood roof sheathing once the sun heats them up.
Ice and water protector sometimes also referred to as ice and water shield is a waterproof roof underlayment membrane developed to protect vulnerable areas on a roof from ice and water damage. The best products are adhesive backed and come with a puncture proof guarantee. Roll roofing a small flat.